20/02779/FP Land At, Windmill Close, Barkway, Hertfordshire

Meeting: 04/11/2021 - Planning Control Committee (Item 18)

18 20/02779/FP LAND AT, WINDMILL CLOSE, BARKWAY, HERTFORDSHIRE pdf icon PDF 325 KB

REPORT OF THE DEVELOPMENT AND CONSERVATION MANAGER

Erection of 24 dwellings and associated access roads. 2.0 m wide pedestrian footpath link to the public open space to the south of Plots 15 and 16 and additional landscape planting between the parking bays and the public open space in the same area of the site (as amended by plans received on 21 July 2021).

Additional documents:

Decision:

RESOLVED: That application 20/02779/FP be GRANTED planning permission subject to the reasons and conditions outlined in the report of the Development and Conservation Manager and the following amendments and additions to conditions:

 

·         Indexation for Herts County Council S106 payments is PUBSEC 175.

 

·         Condition 6 be amended to the following:

 

“Prior to the occupation of the development hereby permitted the principal access road shall be provided 5.5 metres wide with the side access road being 4.8 metres wide  to provide localised widening where possible up to 6.0m without encroaching onto plots 17, 18 and 19. All exiting footways are to include tactiles and dropped kerbs at crossing points and links to footways on the new development, thereafter the access roads and footways shall be retained at the position shown on the approved site layout plan number BEV-537-PA-001 Rev E. Arrangements shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.

 

Reason: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire’s Local Transport Plan.”

 

·         Condition 16 to be amended to the following:

 

“The development permitted by this planning permission shall be carried out carried out in accordance with LLFA consultation letter dated 15 September 2021 prepared by EAS with attachments A-E (Appendix A proposed site layout plan BEV-357-PS-001-Rev E) prepared by MS Square Architect Ltd. Appendix B proposed drainage layout 2822 SK01 Rev D dated 14 September 2021, appendix C Source Control Calculations dated 15 September 2021, Appendix D Micro drainage calculations dated 15 September 2021, appendix E Exceedance Routes 2822 SK05 dated 15 September 2021 all prepared by EAS and the following mitigation measures:

 

1.    Provide minimum attenuation of 162.8 cubic metres and infiltration 262.6 cubic metres to ensure no increase in surface water run off volumes for all rainfall events up to and including the 1 in 100 year + climate change (40%) event.

2.    Implement drainage strategy based private soakaways, permeable paving with sub-base on all roads, mews and parking areas, oversized pipe, geocellular attenuation tanks and a restricted discharge at 2.5I/s at MH44 and 2.9I/s at MH14 via a Hydro brake into the Thames water foul water sewer.

 

Reason: To prevent flooding by ensuring the satisfactory storage/disposal of surface water from the site.”

 

·         Condition 17 to be added as follows:

 

“No development shall take place until the final design of the drainage scheme is completed and sent to the LPA for written approval. All approved drainage details shall be carried out carried out in accordance with LLFA consultation letter dated 15 September 2021 prepared by EAS with attachments A-E (Appendix A proposed site layout plan BEV-357-PS-001-Rev E) prepared by MS Square Architect Ltd. Appendix B proposed drainage layout 2822 SK01 Rev D dated 14 September 2021, appendix C Source Control Calculations dated 15 September 2021, Appendix D Micro drainage calculations dated 15 September  ...  view the full decision text for item 18

Minutes:

Audio recording – 52 minutes 47 seconds

 

The Development and Conservation Manager presented the report in respect of application 20/02779/FP supported by a visual presentation consisting of photographs and plans.

 

The Development and Conservation Manager outlined three additional conditions requested by the LLFA, which included:

 

·         Drainage scheme should be carried out in accordance with a certain specification.

·         More detailed engineering drawings to be agreed prior to commencement.

·         Verification and checking reports upon completion.

 

Further updates provided by the Development and Conservation Manager included:

 

·         Barkway Parish Council continued to object to the development on grounds that local drainage systems would not cope.

·         Condition 6 would be reworded to ensure that road widening should take place as requested, but not to impact the size of plots 17, 18 or 19.

 

The following Members asked questions:

 

·         Councillor David Levett

 

In response to questions, the Development and Conservation manager advised that of the three new conditions, only the condition relating to detailed engineering drawings would be restrictive of the development commencing.

 

The following Members asked questions and took part in the debate:

 

·         Councillor Ian Mantle

 

In response to the debate and questions, the Development and Conservation Manager advised that the whole site was within the village boundary of the new Local Plan.

 

Councillor David Levett highlighted that social/affordable housing was in a separate block, which was not preferred but at least there was some included within the development.

 

Councillor David Levett proposed and Councillor Michael Muir seconded and, following a vote, it was:

 

RESOLVED: That application 20/02779/FP be GRANTED planning permission subject to the reasons and conditions outlined in the report of the Development and Conservation Manager and the following amendments and additions to conditions:

 

·         Indexation for Herts County Council S106 payments is PUBSEC 175.

 

·         Condition 6 be amended to the following:

 

“Prior to the occupation of the development hereby permitted the principal access road shall be provided 5.5 metres wide with the side access road being 4.8 metres wide  to provide localised widening where possible up to 6.0m without encroaching onto plots 17, 18 and 19. All exiting footways are to include tactiles and dropped kerbs at crossing points and links to footways on the new development, thereafter the access roads and footways shall be retained at the position shown on the approved site layout plan number BEV-537-PA-001 Rev E. Arrangements shall be made for surface water drainage to be intercepted and disposed of separately so that it does not discharge from or onto the highway carriageway.

 

Reason: To ensure satisfactory access into the site and avoid carriage of extraneous material or surface water from or onto the highway in accordance with Policy 5 of Hertfordshire’s Local Transport Plan.”

 

·         Condition 16 to be amended to the following:

 

“The development permitted by this planning permission shall be carried out carried out in accordance with LLFA consultation letter dated 15 September 2021 prepared by EAS with attachments A-E (Appendix A proposed site layout plan BEV-357-PS-001-Rev E) prepared by MS Square Architect Ltd. Appendix B proposed  ...  view the full minutes text for item 18